ecf327c872
Eighth review round (the first against the atomic-renewal fix) verdict: the production code holds - CAS exclusivity across real processes, lease-extension schedules, clock skew both directions, renew-per-attempt under 5xx backoff, defer accounting, and the author's mutants all verified - but one shipped regression test could not fail against the property it is named for. test_renewal_extends_the_lease_across_the_post asserted next_attempt_at >= lease_before under a frozen clock. A renewal that matches the row but never extends the lease (M4: SET next_attempt_at = next_attempt_at) satisfies >= trivially, and that mutant double-POSTs: the un-extended lease expires mid-POST and a second process reclaims. The reviewer demonstrated M4 surviving the whole suite while producing a real duplicate send in a two-process schedule. The test now renews 100s into the lease from an advanced clock and requires the deadline to move strictly forward to exactly renewal-clock + 300s. Verified: M4 now fails this test (61 others unaffected); clean HEAD passes all 62. No production code change. 277 tests; ruff + footguns clean.